
As Ghana tightens state control over gold trading, and Burkina Faso, Guinea and Mali pursue domestic refining, West Africa is trying to capture more of the value generated by its gold. The policy shift is visible in new plants, state-backed purchasing arrangements and rules requiring more domestic processing. But announced capacity is only the beginning. Refineries must secure legitimate supplies, operate competitively, and reach markets that demand reliable sourcing and documentation.
The amount of gold a refinery processes does not indicate how much money the country earns from it. Local refining could create jobs, provide business opportunities, and generate revenue, but the benefits depend on operating costs, ownership, and how much of the earnings stay in the country.
Ghana is using state-backed purchasing and export rules to channel gold towards local processing. Burkina Faso has inaugurated a national refinery, Guinea has exported its first domestically refined gold, and Mali’s plans raise questions about capacity and available supply. Although they share the aim of capturing more value from gold production, they have not established a coordinated regional system or current competition for the same customers. What matters is how much gold the refineries process, what they earn, and how much of that value stays in the region.
Comparative production and refining capacity
The latest figures show that Ghana, Burkina Faso, Guinea, and Mali are at different stages in their efforts to refine gold locally.
Ghana produced 5.94 approximately 184.8 tonnes, according to the Ghana News Agency. On 20 October 2026, the Ghana Gold Board (GoldBod) reported that 18.7 tonnes of the 25 tonnes of artisanal and small-scale mining (ASM) gold it had aggregated and exported since 1 August had been refined locally. It also reported refining 5.4 tonnes of the 5.7 tonnes purchased in October. These figures relate to GoldBod-linked operations, not Ghana’s total production. Gold Coast Refinery has a stated capacity of up to two tonnes a week, but its actual annual throughput has not been established.
Burkina Faso’s government reported gold production of more than 94 tonnes in 2025, a figure repeated in Associated Press reporting on the inauguration of the country’s national refinery. However, the Ministry of Energy, Mines and Quarries reported a total of 90.804 tonnes for 2025 in October 2026.
The published reports do not reconcile the difference, so the figures should not be treated as interchangeable. Burkina Faso inaugurated Raffinerie nationale d’or du Burkina Faso (RAFFINOR-BF), the National Gold Refinery of Burkina Faso, on 28 September 2026, announcing an initial theoretical capacity of 164 tonnes annually, potentially expandable to 515 tonnes. Officials witnessed the production of the first gold bars, but routine commercial throughput remains unverified.
Reuters reported Guinea’s 2025 gold production at approximately 72.2 tonnes. Separately, figures from the mining ministry’s 2025 statistical bulletin recorded 20.72 tonnes of industrial and semi-industrial production and 72.12 tonnes of total gold exports, including artisanal gold. These figures cover different categories and should not be conflated. On 9 October 2026, Guinea reportedly exported its first domestically refined gold bars from Nimba Gold Refinery. The shipment’s weight and value were undisclosed. The stated annual capacity is 530 tonnes, potentially expandable to 733 tonnes, but throughput remains unverified.
Mali produced 48.2 tonnes of gold in 2025, comprising 42.2 tonnes from industrial mining and about six tonnes from artisanal mining. Reuters also reported in June 2025 that construction had begun on a refinery near Bamako designed to process 200 tonnes annually. However, the material reviewed does not establish that the facility has been completed, commissioned or begun processing gold. Across the four countries, announced capacity and initial refining or export milestones do not yet establish sustained commercial throughput.
Ghana’s strategy: Control the supply before controlling the refinery.
On 25 June 2026, the Ghana Gold Board, known as GoldBod, announced an agreement requiring large-scale mining companies to sell 30 per cent of their gold output to the state agency, with purchases in Ghanaian cedis at the Bank of Ghana reference rate less a 0.55 per cent discount. Although the memorandum of understanding was formally signed on 13 August, the announcement had set 1 July as the effective date, while the government said implementation would take effect upon signing. The extent of deliveries against the 30 per cent requirement remains unclear.
GoldBod said it will refine gold bought under the agreement locally before sending it to a refinery accredited by the London Bullion Market Association (LBMA) for the required verification and subsequent delivery to the Bank of Ghana’s reserves.
On 20 October, GoldBod chief executive Sammy Gyamfi said the board had purchased 1.8 tonnes of raw gold from large-scale mining companies over two months, valued at about US$224 million. Its artisanal and small-scale mining (ASM) figures describe a separate stream. On the same date, it reported purchasing 5.7 tonnes of artisanal and small-scale mining (ASM) gold during October and refining 5.4 tonnes locally, a reported rate of 94.6 per cent. The published tonnages yield approximately 94.7 per cent when calculated directly. Since 1 August, 18.7 tonnes had been refined locally out of the 25 tonnes aggregated and exported. The board reported this as 76 per cent, although the published tonnages calculate to approximately 74.8 per cent.
The board also identified Gold Coast Refinery and Royal Ghana Gold Refinery, its two ASM refining service partners, as having cumulatively processed 25 tonnes of ASM gold purchased and exported by the board during 2026, around 30 per cent of its reported 85.4 tonnes of ASM gold exports as of 20 October. Since 1 September, self-financing aggregators have also been required to refine doré locally before export.
Earlier, on 20 January 2026, GoldBod announced an agreement with Gold Coast Refinery and South Africa’s Rand Refinery for an initial supply of one metric tonne a week to Gold Coast Refinery, with Rand Refinery contributing technical support. GoldBod also announced that the state had secured a 15 per cent equity interest in Gold Coast Refinery. The refinery’s chief executive, Said Deraz, said the facility could refine up to two tonnes weekly, although actual throughput remains unverified.
GoldBod’s October statement identifies Gold Coast Refinery and Royal Ghana Gold Refinery as its two ASM refining-service partners. Royal Ghana Gold says the Bank of Ghana became a 20 per cent shareholder in 2024 and reports separate refining agreements with GoldBod for ASM gold and with the Bank of Ghana for large-scale gold. Ownership and delivery against announced quantities remain unverified.
Under GoldBod’s mandatory local-refining directive, the self-financing aggregator or its approved off-taker bears the refining cost under their commercial arrangements, and that the charge must be settled before export. A September report put Gold Coast Refinery’s fee at 0.30 per cent of fine-gold value. No published fee schedule was verified for Royal Ghana Gold or the other facilities, so the 0.30 per cent figure should not be treated as a uniform industry tariff.
On 23 June, GoldBod introduced a pricing threshold for licensed buyers. In August, Reuters reported that five industry sources said GoldBod-funded buyers had faced delays of up to three weeks, leading some to suspend purchases or borrow to continue. GoldBod denied a funding shortfall, explaining that direct financing was available to licensed aggregators, while other licensed buyers depended on financing arrangements with those aggregators. It said aggregators assessed such requests based on buyers’ creditworthiness, outstanding obligations, available security, and the risks involved. These were conditions governing access to credit, rather than confirmed explanations for the delays reported by Reuters.
The International Monetary Fund (IMF) estimated that 229 tonnes of Ghanaian artisanal gold worth US$11.4 billion were missing from official trade data between 2019 and 2024. This shows the historical scale of missing trade but does not prove that mandatory refining has increased smuggling. Competitive prices, transparent charges, timely payment, and workable licensing and traceability requirements will be essential to keep legitimate trade within formal channels.
Ghana’s 2025 gold production was reported at 5.94 million ounces. ASM accounted for 3.11 million ounces, or 52.4 per cent, while large-scale mines produced 2.83 million ounces. GoldBod’s move to make X-ray fluorescence testing definitive for purity, pricing and payment from 1 October may standardise assessment, but its effects on disputes and miners’ returns remain unverified.

Burkina Faso: A refinery is in place, but utilisation remains the test.
Burkina Faso inaugurated RAFFINOR-BF in Ouagadougou on 28 September 2026. The government said the project involved investment of about CFA 11 billion, mobilised mainly through the state and the Société Nationale des Substances Précieuses (SONASP), with private-sector partners. The first phase has a stated theoretical capacity of 164 tonnes a year, with a modular second phase that could raise capacity to 515 tonnes. The energy and mines ministry also reported that officials witnessed the production of the first gold bars during the inauguration visit.
Burkina Faso’s 2024 report to the Extractive Industries Transparency Initiative (EITI) recorded SONASP as holding 100 per cent of the national refinery at the end of 2024, with an equity value of CFA 10 million. It also referred to an earlier estimated project cost of CFA 7 billion, excluding land. The later government announcement cited approximately CFA 11 billion in project investment and private-sector participation. The figures show the state’s ownership position at the time and a subsequent increase in reported investment, but the available records do not explain the difference or establish whether private-sector participation changed the shareholding structure.
No public, refinery-level audited accounts or verified monthly throughput figures were located for this report. Commercial viability will depend on reliable, traceable gold supplies and competitive processing costs. Electricity, financing, security and logistics may affect costs, but the evidence reviewed does not establish these as specific operational problems at the facility. The announced 515-tonne capacity remains a proposed expansion, not current output.
Guinea: The ambition to become a regional hub
Reuters reported in June 2026 that Guinea planned a US$30 million refinery with an annual capacity of 530 tonnes, expandable to 733 tonnes. Although commercial operations were forecast for July, commissioning was not confirmed at the time. Guinea also introduced mandatory domestic refining before export, following a 90-day transition that ended on 6 October 2026, with Nimba Gold Refinery expected to support implementation.
On 9 October 2026, Guinea exported its first gold bars refined domestically by Nimba Gold Refinery. Guinean outlets reported the shipment, citing the presidency’s communications directorate and named officials from the national precious-metals expertise office and the central bank. However, officials did not publish the shipment’s weight, value, purity, buyer, or destination.
The foreign minister confirmed private ownership, but the full shareholder list and equity percentages remain unverified. No long-term supply or customer contracts, public fee schedule, or audited throughput figures were located; the first export does not establish annual output or regional supply agreements.
Reuters valued Guinea’s 2025 gold production of approximately 2.32 million ounces at about US$7 billion. Guinean Mines Minister Bouna Sylla said less than one per cent of that value remained in the country. The calculation and definition of value retained were not disclosed, so the figure remains an attributed ministerial claim, not an independently verified measure.
A regional refining hub would need legitimate gold supplies from neighbouring producers, competitive prices, processing charges, logistics and payment terms. Verified supply agreements, throughput and repeat customers would help establish whether Guinea can operate as a viable regional service.
The progress of the refinery project in Mali remains unclear.
Reuters reported in June 2025 that construction had begun near Bamako on a refinery designed to process 200 tonnes of gold annually. The government was to hold a controlling stake, alongside Russia’s Yadran Group and a Swiss investment company. Contemporary reporting put the original shareholding at 62 per cent for the state and 38 per cent for Yadran. The government had not announced a completion deadline.
A project contractor reported fieldwork at the planned Sénou site on 16 April 2026 for environmental and social impact studies involving Malian agencies and the local municipality. This shows preparatory work, not completion or commissioning. As of 23 October, commissioning, current ownership, and signed supply agreements remained unverified.
A Reuters report published in July 2026, based on a Mali mines ministry plan, put industrial gold production at 42.2 tonnes in 2025 and projected 43.2 tonnes in 2026, 51.2 tonnes in 2027, 57 tonnes in 2028 and 50 tonnes in 2029. Artisanal and small-scale production was forecast at about six tonnes annually. The 2025 figure represents reported production, while the figures for subsequent years are projections and should be treated separately. The plan did not explain the basis for the projected trend, and the ministry did not immediately respond to Reuters’ request for comment.
Not all national production would necessarily be available to one refinery, while the facility might seek regional supply or process gold under arrangements not yet documented. Its viability will depend on available supply, operating costs and the ability to sustain commercial operations.
The economics of value addition: What stays at home?
Exporting unrefined gold can leave producing countries paying for processing services abroad. A MyJoyOnline industry commentary cites overseas refining charges of 0.2 to 0.8 per cent of gold value, while a 28 August 2026 report by Ghanamma.com puts Gold Coast Refinery’s local charge at 0.30 per cent of fine-gold value. These figures offer a point of comparison, but they do not prove that local refining is cheaper overall.
Switzerland has an established refining industry supported by international gold trading networks, financial services and access to established bullion markets. Dubai, in the UAE, has developed its own Good Delivery standard and requires gold refineries to follow responsible-sourcing due diligence rules. These systems demonstrate that competitiveness depends not only on refining gold to the required purity but also on meeting recognised standards, documenting its origin and connecting with buyers who accept the refinery’s products.
Ghana’s broader gold purchase costs illustrate why expenses must be separated. In its 2026 report on Ghana, the IMF said costs associated with the gold purchase programme, including service fees, assay charges, intermediary premia and offtaker discounts, averaged 14.5 per cent of purchase costs in 2025.
The IMF reported that reforms were expected to reduce these costs to 5 per cent by July 2026. Domestic refining could generate processing fees, skilled jobs, laboratory services, local contracts, and tax revenue. Governments and private investors may also benefit from ownership returns. However, employment, wages, local procurement, tax contributions and operating returns remain unverified, leaving the net value retained locally unquantified.
A fair comparison requires comparable data on processing fees, energy, financing, logistics, security and turnaround times. The available evidence does not establish these constraints as specific operational problems at any of the four facilities.
Domestic refining could generate processing fees, skilled jobs, support for laboratories, local business opportunities and tax revenue. Governments may benefit through equity holdings and taxes; refinery operators may earn fees and profits; mining companies may gain access to local refining services; and workers and local businesses may benefit from wages and contracts.
However, the available evidence does not establish the facilities’ employment figures, wages, local procurement, tax contributions, or operating returns. Without this data, the net value retained locally remains unquantified.
International buyers will judge more than purity.
Switzerland’s established refining industry and Dubai’s bullion market illustrate the importance of commercial relationships, recognised standards and buyer acceptance alongside technical capability.
The London Bullion Market Association’s Good Delivery system sets standards for refiners and bars accepted within its market framework. The UAE also operates a Good Delivery standard, while its responsible-sourcing rules require refineries to conduct due diligence on their gold supply chains. These frameworks are not interchangeable, and acceptance under one standard does not automatically establish acceptance in every market. A claim that a plant can produce gold at 99.99 per cent purity does not, by itself, prove accreditation or necessarily guarantee access to a particular buyer.
International buyers may require records establishing mine origin and chain of custody, anti-money laundering controls, independent checks and safeguards against human rights abuses and environmental harm. Meeting these requirements takes systems, skilled personnel and resources.
For the West African facilities discussed here, the evidence reviewed does not establish current LBMA Good Delivery status for each refinery or verify buyer contracts and completed sales for every project. Ghana’s GoldBod has described its plan to work towards at least one locally based LBMA-accredited refinery by 2030.
A regional industry or competing national projects?
The four countries are taking different approaches. Ghana uses state-backed purchasing and export requirements, Burkina Faso has inaugurated a refinery, Guinea has exported its first domestically refined gold, and Mali’s facility remains unverified as operational. No evidence establishes a common regional refining system.
Domestic processing policies could make facilities compete for legitimate supply, investment, workers, and customers. Better prices, lower fees, faster payment, and dependable service could attract business, but the evidence does not show that one refinery has taken supply from another or that cross-border contracts exist.
Practical cooperation could begin with common traceability and assay standards, coordinated customs documentation, and cross-border supply agreements to help refineries secure reliable gold supplies. Countries could also explore sharing assay laboratories, secure transport and logistics infrastructure while aligning responsible-sourcing requirements to improve access to international buyers. Any cooperation would require clear rules on customs, taxation, ownership, and export controls.
Reliable electricity, transport, finance, stable regulation and committed buyers are also essential. Reuters reported in October 2026 that Africa’s mineral-processing ambitions face investor concerns around energy costs, reliable supply and market certainty. Gold refining is subject to the same constraints.
The measure of success
West Africa’s refining initiatives have reached different stages of development, but the evidence available by 23 October 2026 does not yet establish how much economic value they retain locally. Ghana has reported volumes of locally refined artisanal and ASM gold and identified its refinery service partners. Burkina Faso has inaugurated RAFFINOR-BF and demonstrated initial refining, while Guinea has exported its first domestically refined gold. Mali’s refinery commissioning remains unverified. These milestones demonstrate progress, not sustained commercial performance or measurable net economic benefits.
Utilisation requires verified, sustained throughput against stated capacity, indicating how much of the installed capacity is being used. This is in accordance with the London Bullion Market Association’s goods delivery rules. Competitiveness requires comparable data on purchase prices, refining fees, operating costs, and payment terms. These are designed to help show whether local facilities can compete commercially, a key concern in the World Bank’s 2026 assessment of the economic feasibility of mineral refining.
Domestic value requires evidence of revenue and profit after operating costs and imported inputs, alongside wages, local procurement, tax contributions and returns to public and private owners. It captures how much value refining generates domestically and how that value is distributed. Market access required verified accreditation status and completed sales to buyers, rather than production alone.
Inclusion requires evidence that artisanal miners and legitimate traders can use formal channels on workable terms and receive competitive prices and timely payment. This ensures that participation and benefits extend beyond refinery operators.
Until those results are documented, announced capacity and initial shipments remain milestones, not proof of how much value reaches workers, businesses, and the wider economy.
